Line 11 (Shanghai Metro)
Line of Shanghai Metro / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Line 11 (Shanghai Metro)?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Line 11 is a northwest–southeast line of the Shanghai Metro network. Since October 2013, Line 11 serves Kunshan city, making it is the second intercity metro in China after the Guangfo Metro and the first that crosses a provincial boundary. [citation needed]With a single-line mileage of 82.386 kilometres (51.192 mi), it is the second-longest single-line subway line in China, after Line 6 in Chongqing, which is 85.6 km (53.2 mi) long. The line is colored brown on system maps.
Quick Facts Overview, Other name(s) ...
Line 11 | |
---|---|
Overview | |
Other name(s) | R3 (planned name); Shenjia line (Chinese: 申嘉线) |
Native name | 上海地铁11号线 |
Status | Operational |
Owner | Shanghai Rail Transit Shenjia Line Development Co., Ltd. (Shanghai segment) Kunshan Rail Transit Investment Development Co., Ltd. (Kunshan segment) |
Locale | Pudong; Xuhui, Changning, Putuo, and Jiading districts, Shanghai, China Kunshan, Jiangsu, China |
Termini | |
Stations | 39 (plus reserve station Yanyu Road) |
Service | |
Type | Rapid transit |
System | Shanghai Metro |
Services | Mainline: Disney Resort ↔ North Jiading Branchline: Disney Resort ↔ Huaqiao |
Operator(s) | Shanghai No. 2 Metro Operation Co. Ltd. |
Depot(s) | Shanghai Circuit Depot; North Jiading parking lot; Chuanyang River parking lot |
Rolling stock | 82 Class A 6-car trains |
Daily ridership | 1.012 million (2019 peak)[1] |
History | |
Commenced | December 30, 2005; 18 years ago (2005-12-30) |
Opened | December 31, 2009; 14 years ago (2009-12-31) |
Last extension | April 26, 2016; 8 years ago (2016-04-26) |
Technical | |
Line length | 82.4 km (51.20 mi) |
Number of tracks | 2 |
Character | Underground, open cut + elevated |
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) |
Electrification | Overhead lines (1500 volts DC) |
Operating speed | 100 km/h (62 mph) Average speed: 40.3 km/h (25 mph)[citation needed] (mainline) 38.8 km/h (24 mph)[citation needed] (branchline) |
Signalling | Thales’ SelTracTM CBTC |
Close