Transwestern Pipeline Company v. Corinne Grace
From Wikipedia, the free encyclopedia
Transwestern Pipeline Company v. Corinne Grace was a hearing before the Federal Energy Regulatory Commission (FERC) on May 25, 1990. Transwestern Pipeline claimed that Grace, an independent oil and gas operator, had a well that was misclassified by the New Mexico Oil Conservation Division (NM OCD) as what is called a stripper well under §108 (Ceiling Price for Stripper Well Natural Gas) of the Natural Gas Policy Act of 1978 (NGPA).[1] A stripper well is a well that is marginally productive.[2] The underlying issue was the geology of the Morrow Formation in New Mexico and the reliability of the information the oil and gas commission of one state had based its decision on based on this type of geological formation and its characteristics. Around this same time, Corinne Grace was also in the 1990 FERC hearing for Corinne B. Grace v. El Paso Natural Gas Company.
The hearing had a significant effect on U.S. oil and gas supply because of the number of stripper wells and their ability to supply natural gas for the U.S. economy. In recent history, stripper well production makes up about 8.2% of United States natural gas production,[3] and the stripper well classification is the classification of a large majority of the number of U.S. onshore wells.[4][2]