Waste Isolation Pilot Plant
Deep geological repository for radioactive waste / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Waste Isolation Pilot Plant?
Summarize this article for a 10 year old
The Waste Isolation Pilot Plant, or WIPP, in New Mexico, US, is the world's third deep geological repository (after Germany's Repository for radioactive waste Morsleben and the Schacht Asse II salt mine) licensed to store transuranic radioactive waste for 10,000 years. The storage rooms at the WIPP are 2,150 feet (660 m) underground in a salt formation of the Delaware Basin. The waste is from the research and production of United States nuclear weapons only.[1][2] The plant started operation in 1999, and the project is estimated to cost $19 billion in total.[3]
Waste Isolation Pilot Plant | |
---|---|
General information | |
Type | WIPP |
Location | 26 mi (42 km) east of Pecos River |
Country | United States |
Coordinates | 32°22′18″N 103°47′37″W |
Website | |
DOE: Waste Isolation Pilot Plant |
It is located approximately 26 miles (42 km) east of Carlsbad, in eastern Eddy County, in an area known as the southeastern New Mexico nuclear corridor, which also includes the National Enrichment Facility near Eunice, New Mexico, the Waste Control Specialists low-level waste disposal facility just over the state line near Andrews, Texas, and the International Isotopes, Inc. facility to be built near Eunice, New Mexico.[4]
Various mishaps at the plant in 2014 brought focus to the problem of what to do with the growing backlog of waste and whether or not WIPP would be a safe repository.[5] The 2014 incidents involved a waste explosion and airborne release of radiological material that exposed 21 plant workers to small doses of radiation that were within safety limits.[6]