Meadow Well Metro station
Tyne and Wear Metro station in North Tyneside / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Meadow Well Metro station?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
Meadow Well is a Tyne and Wear Metro station, serving the suburbs of Chirton and Meadow Well, North Tyneside in Tyne and Wear, England. It joined the network as Smith's Park on 14 November 1982, following the opening of the fourth phase of the network, between Tynemouth and St James via Wallsend.
Quick Facts General information, Location ...
Meadow Well | |||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|
Tyne and Wear Metro station | |||||||||||
General information | |||||||||||
Location | Meadow Well, North Tyneside England | ||||||||||
Coordinates | 55°00′06″N 1°27′56″W | ||||||||||
Grid reference | NZ342675 | ||||||||||
Transit authority | Tyne and Wear PTE | ||||||||||
Platforms | 2 | ||||||||||
Tracks | 2 | ||||||||||
Construction | |||||||||||
Bicycle facilities | 2 cycle pods | ||||||||||
Accessible | Step-free access to platform | ||||||||||
Other information | |||||||||||
Station code |
| ||||||||||
Fare zone | B and C | ||||||||||
History | |||||||||||
Original company | Tyne and Wear Metro | ||||||||||
Key dates | |||||||||||
14 November 1982 | Opened as Smith's Park | ||||||||||
10 October 1994 | Renamed Meadow Well | ||||||||||
Passengers | |||||||||||
2017/18 | 0.30 million[1] | ||||||||||
Services | |||||||||||
| |||||||||||
|
Close