Metro North West Line
Metro line in Sydney / From Wikipedia, the free encyclopedia
Dear Wikiwand AI, let's keep it short by simply answering these key questions:
Can you list the top facts and stats about Metro North West Line?
Summarize this article for a 10 year old
SHOW ALL QUESTIONS
The Metro North West Line is a rapid transit rail line in Sydney, New South Wales, Australia. The first and currently the only line on the Sydney Metro network, it commenced operation on 26 May 2019, running between Tallawong and Chatswood.
This article is about the passenger rail line in Sydney. For the associated railway project that built this line, see Sydney Metro Northwest.
Quick Facts Overview, Service type ...
Metro North West Line | |||||
---|---|---|---|---|---|
Overview | |||||
Service type | Rapid transit | ||||
Locale | Sydney, Australia | ||||
First service | 26 May 2019 (Chatswood to Tallawong) 2024 (Sydenham to Tallawong) 2025 (Bankstown to Tallawong) | ||||
Current operator(s) | Metro Trains Sydney | ||||
Route | |||||
Termini | Tallawong Chatswood | ||||
Stops | 13 | ||||
Distance travelled | 36 km (22 mi) | ||||
Average journey time | 37 minutes[1] | ||||
Service frequency | 4 minutes (peak) 10 minutes (off-peak)[1] | ||||
Technical | |||||
Rolling stock | Metropolis Stock fully automated trains, 6 carriages per train | ||||
Track gauge | 1,435 mm (4 ft 8+1⁄2 in) standard gauge | ||||
Electrification | 1,500 V DC from overhead catenary | ||||
Operating speed | Limit of 100 km/h (62 mph) | ||||
Track owner(s) | Transport Asset Holding Entity | ||||
|
Close